Petroleum & Chemical Storage
Bulk Storage Systems
The company is highly experienced in the design and inspection of petroleum and chemical bulk storage systems. Included in this category are compliance inspections and system upgrades.
We have designed well in excess of 150 systems at facilities including:
Spill Prevention
Spill Prevention, Control and Countermeasure Plans (SPCCs) are an important part of every petroleum bulk storage facility, and we have prepared something in the excess of 100 of these plans. These plans are required when the client has petroleum storage (more than 1,320 gallons in aboveground storage tanks) and outline procedures for inspection, maintenance and spill response.
For chemical bulk storage facilities, Spill Prevention Reports (SPRs) are prepared to outline requirements for preventing and responding to spills.
Annual and 5-year tank inspections are required for all CBS tanks. We have performed a few hundred annual and 5-year inspections on aboveground tanks.
Secondary Containment for unloading areas and how to handle the associated runoff can be a challenge at many CBS facilities. We have designed many containment pads and dikes for CBS and petroleum facilities.
